171 Coffs City Rotary Bush Tucker planting 1 2-6-18
170 Coffs City Rotary Bush Tucker planting 2-6-18
169 Bush Tucker Forest planting day 2-6-18
168 Kids area 31-5-18
167 Bush Tucker Forest area 31-5-18
166 Back arch to entrance 31-5-18
165 Poly tunnel bank started 31-5-18
164 Compost and soil 31-5-18
163 Communal beds 31-5-18
162 Entrance 31-5-18
161 Overall view 31-5-18
160 shade garden 27-5-18
159 Communal Lufa and Madagascar Beans 27-5-18
158 Communal Peas 27-5-18
157 Succulent-Cactus bed 27-5-18
156 Bush Tucker prepared 27-5-18
155 Bush Tucker preparation 27-5-18
154 Toormina Market day 25-5-18
153 Communal beds 22-5-18
152 Kids area V
151 Bush Tucker forest laid out 22-5-18
150 Bank garden extended 22-5-18
149 Poly tunnel finished 22-5-18
148 Orchard 22-5-18
147 Poly tunnel finished 15-5-18
146 Poly tunnel stocked 15-5-18
145 Shade garden 15-5-18
144 Compost turned 15-5-18
143 Communal bed netting 10-5-18
142 Poly tunnel gate finished 10-5-18
141 Poly tunnel benches go in 10-5-18
140 Start of Succulent-Cactus garden 8-5-18
139 Orchard 6-5-18
138 Chris mows the grass 6-5-18
137 LH Entrance 1-5-18
136 RH Entrance 1-5-18
135 Communal Beds 1-5-18
134 Start of orchard-4 19-4-18
133 Start of orchard-3 19-4-18
132 Start of orchard-2 19-4-18
131 Start of orchard-1 19-4-18
130 Working bee for poly tunnel-10 6-5-18
129 Working bee for poly tunnel-9 6-5-18
128 Working bee for poly tunnel-8 6-5-18
127 Working bee for poly tunnel-7 25-3-18
126 Working bee for poly tunnel-6 18-3-18
125 Working bee for poly tunnel-5 18-3-18
124 Working bee for poly tunnel-4 17-3-18
123 Working bee for poly tunnel-3 17-3-18
122 Working bee for poly tunnel-2 15-3-18
121 Working bee for poly tunnel-1 15-3-18
120 Tanks complete and connected 15-3-18
119 Watering station completed 15-3-18
118 Start of rest and relaxation area 15-3-18
117 Preparation for Working bee for poly tunnel-4 13-3-18
116 Preparation for Working bee for poly tunnel-3 13-3-18
115 Preparation for Working bee for poly tunnel-2 13-3-18
114 Preparation for Working bee for poly tunnel-1 13-3-18
113 Fence paling bird feeder by John H 13-3-18
112 Fence paling productions by John H 11-3-18
111 Fence palings collected by John H 11-3-18
110 Kids area developed by THS students 11-3-18
109 2nd bank garden added 11-3-18
108 Bank garden progresses 11-3-18
107 IBC’s connected to tank overflow 11-3-18
106 Automatic water station for watering cans 11-3-18
105 Initial layout for poly tunnel 11-3-18
104 Toormina High School Special Ed group starts visiting 1-3-18
103 Coffs Harbour Garden Club visits 1-3-18
102 Spiderlings 25-2-18
101 Volunteer mows our grass 20-2-18
100 Tank connected to roof 13-2-18
099 Tank in position 13-2-18
098 Unloading 10000L tank 13-2-18
097 Unloading half tank 13-2-18
096 Tank arrives 13-2-18
095 Final Arch-Childrens area 28-1-18
094 Bank Garden start 28-1-18
093 Temporary Tank using IBC’s 28-1-18
092 Herb bed 28-1-18
091 Alamanda 28-1-18
090 Madagascar Beans 28-1-18
089 Native Rosella 28-1-18
088 Rental Beds 28-1-18
087 Integrated Pest Management Plan-Plan B 10-5-18
086 Integrated Pest Management Plan Alternate 1-3-18
085 Integrated Pest Management Plan Backup 28-1-18
084 Integrated Pest Management Plan 28-1-18
083 Communal beds 28-1-18
082 Sunflowers back 28-1-18
081 Sunflowers closeup 28-1-18
080 Sunflowers 28-1-18
079 LH Entrance 28-1-18
078 Entrance 28-1-18
077 Communal beds finished & filled 21-11-17
076 RH Entrance 21-11-17
075 LH Entrance 21-11-17
074 Sustainable Living stall 18-11-17
073 November 2017 meeting under the trees 5-11-17
072 Containers roof finished 29-10-17
071 Containers roof continues 26-10-17
070 Containers roof starts 24-10-17
069 Entrance progresses 15-10-17
068 Communal beds filled 1-10-17
067 1st Biomass delivery 31-8-17
066 Communal beds finished 17-8-17
065 Tank stands ready 26-7-17
064 Start on communal beds & frames 16-7-17
063 Cuttings for entrance hedge 27-6-17
062 Sign goes up 24-6-17
061 Entrance progresses 24-6-17
060 Luke Hartsuyker visit 3-5-17
059 mulch
058 new chipper-Graham John Bob
057 the entrance
056 the entrance
055 the entrance
054 the entrance
053 the entrance
052 The entrance
051 arch-1st- partly finished
050 compost bins
049 working bee-garden beds
048 working bee-garden beds
047 working bee-garden beds
046 working bee-garden beds
045 working bee-garden beds
044 working bee-garden beds
043 working bee-garden beds
042 working bee-garden beds
041 working bee-garden beds
040 working bee-garden beds
039 Toormina gardens
038 Toormina gardens
037 Toormina gardens
036 Toormina gardens
035 Toormina gardens
034 Water problems
033 Water problems
032 Water problems
031 Water problems
030 Water problems
029 levelling finished 1st 2nd 3rd quadrant
028 levelling 3rd quadrant
027 levelling 4th quadrant
026 Pathways complete
025 The path base goes down
024 The path layout
023 Pathways started
022 The fence finished
021 The fence workers-Graham and Bob
020 The Fence starts
019 finishing slab
018 slab
017 small container
016 large container-workers
015 large container
014 large container
013 container foundations
012 container foundations
011 Graham and Steve McGrane on air
010 logo
009 logo contest
008 Fundraising BBQ Masters Store
007 Club Grant
006 Concept Plan unveiling
005-boundary survey-west side
004-Why we extended the fence to cover the entire perimeter
003-What we started with-view from south corner to trees and Highway
002-What we started with-view from north corner to Bruce King Drive
001 What we started with-view from north corner across to Community Centre
Access Token not set. You can generate Access Tokens for your Page or Profile on fb.srizon.com. After generating the access token, insert it on the backend